Part of Deeside Way is to have a temporary closure due to essential drainage works to prevent flooding.
The section is from Murtle Mill to West Cults Road and it will be closed from Monday 28 September 2026 for about three weeks.
There will be a diversion via North Deeside Road.
The works, which are necessary after the path was previously flooded at Old Ferry Road to Golf Road, will improve the drainage either side of the path to ensure there is no repeat.